MEPCO New Connection 2026 – Apply, Fees and Tracking
MEPCO New Connection is the process of applying for a new electricity supply from Multan Electric Power Company (MEPCO) in South Punjab. Whether you are building a home, opening a shop, or moving into a new property, you need an official MEPCO electricity connection with a meter, consumer ID, and reference number before you can receive monthly bills.
MEPCO Bill Checker
Enter your 14-digit reference number or 10-digit consumer ID to view your MEPCO bill
Use only the reference number printed on your MEPCO electricity bill.
Which Category Your MEPCO Connection Falls Into
MEPCO classifies new connections by usage type: domestic (residential), commercial (shops and offices), industrial (factories), agricultural (tubewell), and temporary (construction sites). Each category has different documentation requirements, security deposit amounts, and tariff rates. Select the correct category when submitting your application to avoid delays.
- Domestic: Houses, flats, and residential units
- Commercial: Shops, restaurants, and small businesses
- Industrial: Manufacturing units and workshops
- Agricultural: Tubewell and farm connections
- Temporary: Under-construction buildings (valid for limited period)
Documents Required for MEPCO New Connection
Gather these documents before visiting your nearest MEPCO subdivision office or applying online through the official portal:
- CNIC copy of the applicant (owner or authorized person)
- Property ownership documents or registered sale deed
- Approved building plan / map from relevant authority
- Neighbor’s electricity bill copy (for load assessment reference)
- Affidavit on stamp paper (format available at MEPCO office)
- Passport-size photographs of the applicant
- NOC from housing society (if applicable)
Applying as a Tenant
Tenants can apply for a MEPCO new connection with a rent agreement, landlord’s CNIC copy, and a No Objection Certificate (NOC) from the property owner. The connection is registered in the tenant’s name but linked to the property address.
How to Apply for MEPCO New Connection
- Visit your nearest MEPCO customer service center or subdivision office
- Collect and fill the new connection application form
- Submit documents with the application fee
- MEPCO conducts a site survey and load assessment
- Receive a demand notice with connection charges
- Pay the demand notice amount at designated banks
- Meter installation and connection activation
- Receive your Consumer ID and Reference Number on first bill
For official procedures and forms, visit the MEPCO official website.
MEPCO New Connection Fee and Charges
New connection costs include application fee, security deposit, meter charges, and connection material costs. The total amount appears on the demand notice after site inspection. Charges vary by connection type (single-phase vs three-phase) and sanctioned load (kW). Domestic single-phase connections are generally the most affordable.
The Demand Notice Explained
After your application is approved, MEPCO issues a demand notice listing all payable charges. You must pay this notice at an authorized bank within the validity period (usually 30 days). If the notice expires, you may need to restart the application process.
How Long MEPCO Takes for New Connection
Under NEPRA regulations, MEPCO must process standard domestic new connection applications within 30 days of complete document submission. Commercial and industrial connections may take longer due to load studies and infrastructure requirements. Track your application status at the subdivision office or through MEPCO helpline 118 or toll-free 0800-63726.
Tracking Your MEPCO Connection Application
Keep your application receipt number safe. Visit the MEPCO subdivision office where you applied and provide the receipt number to check status. Once connected, use our MEPCO Bill Checker with your new Reference Number to view bills online.
Temporary Connection for Construction
Building a house? Apply for a temporary MEPCO connection valid during construction. After completion, convert to a permanent domestic connection by submitting the completion certificate and updated property documents.
Your First MEPCO Bill After New Connection
After meter installation, your first electricity bill arrives within one billing cycle. It includes the Consumer ID and 14-digit Reference Number you need for online bill checking. Save these numbers immediately. Use our MEPCO Bill Calculator to estimate future bills based on your consumption.
Frequently Asked Questions
How much does a MEPCO new connection cost?
Costs vary by connection type and load. Domestic single-phase connections typically range from Rs 15,000 to Rs 50,000 including security deposit and meter charges. The exact amount is on your demand notice after site inspection.
Can I apply for MEPCO connection online?
MEPCO is expanding online services, but most new connection applications still require a visit to the subdivision office with physical documents. Check the official MEPCO portal for the latest online application availability in your area.
What is the MEPCO new connection helpline?
Call MEPCO helpline 118 or toll-free 0800-63726 for new connection inquiries, application status, and document requirements.