MEPCO New Connection 2026

MEPCO New Connection is the process of applying for a new electricity supply from Multan Electric Power Company (MEPCO) in South Punjab. Whether you are building a home, opening a shop, or moving into a new property, you need an official MEPCO electricity connection with a meter, consumer ID, and reference number before you can receive monthly bills.

MEPCO Bill Checker

Enter your 14-digit reference number or 10-digit consumer ID to view your MEPCO bill

Use only the reference number printed on your MEPCO electricity bill.

Example: 14123456789012
Example: 1234567890

Which Category Your MEPCO Connection Falls Into

MEPCO classifies new connections by usage type: domestic (residential), commercial (shops and offices), industrial (factories), agricultural (tubewell), and temporary (construction sites). Each category has different documentation requirements, security deposit amounts, and tariff rates. Select the correct category when submitting your application to avoid delays.

  • Domestic: Houses, flats, and residential units
  • Commercial: Shops, restaurants, and small businesses
  • Industrial: Manufacturing units and workshops
  • Agricultural: Tubewell and farm connections
  • Temporary: Under-construction buildings (valid for limited period)

Documents Required for MEPCO New Connection

Check the current checklist on the official Electricity New Connection portal before applying, because required documents can vary by connection category and sanctioned load. Commonly requested items include:

  1. CNIC copy of the applicant (owner or authorized person)
  2. Property ownership documents or registered sale deed
  3. Approved building plan / map from relevant authority
  4. Neighbor’s electricity bill copy (for load assessment reference)
  5. Affidavit on stamp paper (format available at MEPCO office)
  6. Passport-size photographs of the applicant
  7. NOC from housing society (if applicable)

Applying as a Tenant

Tenants can apply for a MEPCO new connection with a rent agreement, landlord’s CNIC copy, and a No Objection Certificate (NOC) from the property owner. The connection is registered in the tenant’s name but linked to the property address.

How to Apply for MEPCO New Connection

  1. Open the official Electricity New Connection portal and select MEPCO.
  2. Choose the correct connection category and enter the applicant and premises details.
  3. Upload the documents requested for your category and sanctioned load.
  4. Save the application or tracking number shown after submission.
  5. Cooperate with any site survey, load assessment or document verification.
  6. Review the demand notice and pay it only through an authorised channel.
  7. Track progress online and contact the relevant MEPCO office if additional action is requested.
  8. After energisation, save the Consumer ID and 14-digit Reference Number shown on your bill.

For official procedures and forms, visit the MEPCO official website.

MEPCO New Connection Fee and Charges

New connection costs include application fee, security deposit, meter charges, and connection material costs. The total amount appears on the demand notice after site inspection. Charges vary by connection type (single-phase vs three-phase) and sanctioned load (kW). Domestic single-phase connections are generally the most affordable.

The Demand Notice Explained

After technical review, MEPCO may issue a demand notice listing the approved connection charges and payment instructions. Check the notice itself for its validity date and pay only through the authorised channel shown. If it expires, contact MEPCO or use the official portal for the current revalidation procedure.

How Long MEPCO Takes for New Connection

Processing time depends on the connection category, load, document completeness, site conditions and whether network extension or other technical work is required. Use your application number to track progress through the official portal, and contact MEPCO on 118 or 0800-63726 when the displayed status needs clarification.

Tracking Your MEPCO Connection Application

Keep your application receipt number safe. Visit the MEPCO subdivision office where you applied and provide the receipt number to check status. Once connected, use our MEPCO Bill Checker with your new Reference Number to view bills online.

Temporary Connection for Construction

Building a house? Apply for a temporary MEPCO connection valid during construction. After completion, convert to a permanent domestic connection by submitting the completion certificate and updated property documents.

Your First MEPCO Bill After New Connection

After meter installation, your first electricity bill arrives within one billing cycle. It includes the Consumer ID and 14-digit Reference Number you need for online bill checking. Save these numbers immediately. Use our MEPCO Bill Calculator to estimate future bills based on your consumption.

Frequently Asked Questions

How much does a MEPCO new connection cost?

Costs vary by connection category, sanctioned load, security deposit, meter arrangement and any required network work. Use the official cost estimate facility where available and rely on the demand notice issued for your application rather than a generic price range.

Can I apply for MEPCO connection online?

Yes. Start through the official Electricity New Connection portal, select MEPCO, complete the application and follow the displayed document and payment steps. A site visit or office verification may still be required for technical or document checks.

What is the MEPCO new connection helpline?

Call MEPCO helpline 118 or toll-free 0800-63726 for new connection inquiries, application status, and document requirements.